{"id":12378,"date":"2025-08-01T16:25:28","date_gmt":"2025-08-01T10:55:28","guid":{"rendered":"https:\/\/www.torusdigital.com\/toruscope\/?p=12378"},"modified":"2025-11-24T11:21:00","modified_gmt":"2025-11-24T05:51:00","slug":"parth-electricals-ipo-opens","status":"publish","type":"post","link":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/","title":{"rendered":"Parth Electricals IPO Opens: Key Details Investors Shouldn\u2019t Miss"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><p>[vc_section el_id=&#8221;blog-inner-layout&#8221;][vc_row overlay_dotted=&#8221;&#8221;][vc_column el_class=&#8221;blog_primary&#8221;][vc_row_inner][vc_column_inner][vc_column_text css=&#8221;&#8221;]<span style=\"font-weight: 400;\">The<\/span><a href=\"https:\/\/www.torusdigital.com\/ipo\"><span style=\"font-weight: 400;\"> Indian IPO market<\/span><\/a><span style=\"font-weight: 400;\"> remains a key area of interest for investors, with Parth Electricals &amp; Engineering Ltd. emerging as a new participant, ready to make its debut. The company is launching a book-building IPO to raise \u20b949.72 crores, with the subscription window running from August 4 to August 6, 2025. This fresh issue presents an opportunity for investors to engage with a company deeply involved in the electrical equipment and engineering solutions sector, a critical component of India\u2019s ongoing infrastructure and industrial growth. Parth Electricals\u2019 focus on providing electrical solutions and equipment positions it well in the rapidly expanding infrastructure and industrial sectors.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This blog post provides a look at the <\/span><a href=\"https:\/\/www.torusdigital.com\/ipo\/parth-electricals-engineering-ltd-ipo\"><span style=\"font-weight: 400;\">Parth Electricals IPO<\/span><\/a><span style=\"font-weight: 400;\"> details, including its business, financials, and key investment considerations.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"About_Parth_Electricals_Engineering_Ltd\"><\/span><b>About Parth Electricals &amp; Engineering Ltd.<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Established in 2007, <a href=\"https:\/\/www.torusdigital.com\/stocks\/parth-electricals-engineering-ltd-share-price\">Parth Electricals &amp; Engineering Ltd.<\/a> is a provider of a wide range of electrical equipment and engineering solutions. The company&#8217;s diverse portfolio includes:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Manufacturing and Supply:<\/b><span style=\"font-weight: 400;\"> RMU (Ring Main Units), PSS\/CSS (Package Substation\/Compact Substation), MV (Medium Voltage) Switchgear Panels, and various Control &amp; Protection Relay Panels.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Services &amp; EPC:<\/b><span style=\"font-weight: 400;\"> The company also provides complete installation, testing, and commissioning services for electrical substations and power cables up to 220KV. It also offers specialised services for Gas Insulated and Air Insulated switchgears.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">With its manufacturing facilities, the company has a strong footprint in the power and infrastructure sectors, serving a wide array of industrial clients.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Parth_Electricals_Engineering_Ltd_IPO_Details\"><\/span><b>Parth Electricals &amp; Engineering Ltd. IPO Details<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The Parth Electricals IPO is a book-building issue of up to 29,24,800 fresh shares, with the aim of raising \u20b949.72 crores. The price band has been fixed at \u20b9160 to \u20b9170 per share, with a face value of \u20b910. The shares will be listed on the NSE SME platform.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Important_IPO_Timeline\"><\/span><b>Important IPO Timeline:<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Event<\/b><\/td>\n<td><b>Date<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">IPO Open Date<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Mon, Aug 4, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">IPO Close Date<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Wed, Aug 6, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Tentative Allotment<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Thu, Aug 7, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Initiation of Refunds<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Thu, Aug 7, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Credit of Shares to Demat<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Fri, Aug 8, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Tentative Listing Date<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Mon, Aug 11, 2025<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Cut-off time for UPI mandate confirmation<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5 PM on Aug 6, 2025<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Key_IPO_Details\"><\/span><b>Key IPO Details<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Particulars<\/b><\/td>\n<td><b>Details<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Face Value<\/b><\/td>\n<td><span style=\"font-weight: 400;\">\u20b910 per share<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Issue Price Band<\/b><\/td>\n<td><span style=\"font-weight: 400;\">\u20b9160 to \u20b9170 per share<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Lot Size<\/b><\/td>\n<td><span style=\"font-weight: 400;\">800 Shares<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Sale Type<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Fresh Capital<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Total Issue Size<\/b><\/td>\n<td><span style=\"font-weight: 400;\">29,24,800 shares (aggregating up to \u20b949.72 Cr)<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Issue Type<\/b><\/td>\n<td><span style=\"font-weight: 400;\">Bookbuilding IPO<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Listing At<\/b><\/td>\n<td><span style=\"font-weight: 400;\">NSE SME<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Share Holding Pre Issue<\/b><\/td>\n<td><span style=\"font-weight: 400;\">1,07,43,155 shares<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Share Holding Post Issue<\/b><\/td>\n<td><span style=\"font-weight: 400;\">1,36,67,955 shares<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Lot_Size_of_Parth_Electricals_Engineering_Ltd_IPO\"><\/span><b>Lot Size of Parth Electricals &amp; Engineering Ltd. IPO<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Application<\/b><\/td>\n<td><b>Lots<\/b><\/td>\n<td><b>Shares<\/b><\/td>\n<td><b>Amount<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Individual investors (Retail) (Min)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1,600<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b92,72,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Individual investors (Retail) (Max)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1,600<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b92,72,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>S-HNI (Min)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">3<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2,400<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b94,08,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>S-HNI (Max)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">7<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5,600<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b99,52,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>B-HNI (Min)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">8<\/span><\/td>\n<td><span style=\"font-weight: 400;\">6,400<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b910,88,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Employee (Min)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">1,600<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b92,72,000<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Employee (Max)<\/b><\/td>\n<td><span style=\"font-weight: 400;\">1.00<\/span><\/td>\n<td><span style=\"font-weight: 400;\">800<\/span><\/td>\n<td><span style=\"font-weight: 400;\">\u20b91,36,000<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><\/h2>\n<h2><span class=\"ez-toc-section\" id=\"Parth_Electricals_Engineering_Financial_Performance\"><\/span><b><a href=\"https:\/\/torusdigital.go.link\/hgQeE\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"responsive-img aligncenter\" src=\"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/07\/Desktop-1.jpg\" alt=\"\" width=\"451\" height=\"326\" \/><\/a>Parth Electricals &amp; Engineering Financial Performance<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The company has shown a positive financial trend. Its revenue from operations increased from \u20b987.17 crores in FY24 to \u20b9176.20 crores in FY25, marking a growth of 102%. During the same period, its Profit After Tax (PAT) also saw a substantial increase of 119%, rising from \u20b94.61 crores to \u20b910.12 crores. This growth is indicative of the company&#8217;s expanding market presence and improving operational efficiency.<\/span><\/p>\n<h3><span class=\"ez-toc-section\" id=\"Key_Performance_Indicators_as_of_March_31_2025\"><\/span><b>Key Performance Indicators (as of March 31, 2025)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>ROE:<\/b><span style=\"font-weight: 400;\"> 24.92%<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>ROCE:<\/b><span style=\"font-weight: 400;\"> 23.38%<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Debt\/Equity:<\/b><span style=\"font-weight: 400;\"> 0.82<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>RoNW:<\/b><span style=\"font-weight: 400;\"> 24.92%<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>PAT Margin:<\/b><span style=\"font-weight: 400;\"> 5.79%<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>EBITDA Margin:<\/b><span style=\"font-weight: 400;\"> 10.04%<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Price to Book Value:<\/b><span style=\"font-weight: 400;\"> 4.13<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Financial_Snapshot_%E2%82%B9_in_crores\"><\/span><b>Financial Snapshot (\u20b9 in crores)<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Period Ended<\/b><\/td>\n<td><b>31 Mar 2025<\/b><\/td>\n<td><b>31 Mar 2024<\/b><\/td>\n<td><b>31 Mar 2023<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Assets<\/b><\/td>\n<td><span style=\"font-weight: 400;\">106.76<\/span><\/td>\n<td><span style=\"font-weight: 400;\">67<\/span><\/td>\n<td><span style=\"font-weight: 400;\">50.70<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Revenue<\/b><\/td>\n<td><span style=\"font-weight: 400;\">176.2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">87<\/span><\/td>\n<td><span style=\"font-weight: 400;\">65.70<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Profit After Tax<\/b><\/td>\n<td><span style=\"font-weight: 400;\">10.12<\/span><\/td>\n<td><span style=\"font-weight: 400;\">5<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2.45<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>EBITDA<\/b><\/td>\n<td><span style=\"font-weight: 400;\">17.53<\/span><\/td>\n<td><span style=\"font-weight: 400;\">9<\/span><\/td>\n<td><span style=\"font-weight: 400;\">4.31<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Net Worth<\/b><\/td>\n<td><span style=\"font-weight: 400;\">40.59<\/span><\/td>\n<td><span style=\"font-weight: 400;\">15<\/span><\/td>\n<td><span style=\"font-weight: 400;\">9.58<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Reserves and Surplus<\/b><\/td>\n<td><span style=\"font-weight: 400;\">30.57<\/span><\/td>\n<td><span style=\"font-weight: 400;\">13<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8.64<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Total Borrowing<\/b><\/td>\n<td><span style=\"font-weight: 400;\">33.33<\/span><\/td>\n<td><span style=\"font-weight: 400;\">15.84<\/span><\/td>\n<td><span style=\"font-weight: 400;\">8.43<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><span class=\"ez-toc-section\" id=\"Use_of_IPO_Proceeds\"><\/span><b>Use of IPO Proceeds<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The funds raised from the Parth Electricals IPO will be utilised for the following key objectives:<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><b>S.No.<\/b><\/td>\n<td><b>Objects of the Issue<\/b><\/td>\n<td><b>Expected Amount (in Millions)<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">1<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Establishing GIS manufacturing facility in Gujarat<\/span><\/td>\n<td><span style=\"font-weight: 400;\">200<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">2<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Establishing manufacturing facility in Odisha<\/span><\/td>\n<td><span style=\"font-weight: 400;\">190<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">3<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Repayment of Short Term Borrowings<\/span><\/td>\n<td><span style=\"font-weight: 400;\">150<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">4<\/span><\/td>\n<td><span style=\"font-weight: 400;\">General corporate purposes<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Not Provided<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3><span class=\"ez-toc-section\" id=\"Parth_Electricals_Engineering_Ltd_IPO_Peer_Comparison\"><\/span><b>Parth Electricals &amp; Engineering Ltd. IPO Peer Comparison<\/b><span class=\"ez-toc-section-end\"><\/span><\/h3>\n<p><span style=\"font-weight: 400;\">Parth Electricals operates in a competitive segment of the electrical equipment industry. Its peers include listed companies such as <\/span><a href=\"https:\/\/www.torusdigital.com\/stocks\/supreme-power-equipment-ltd-share-price\"><span style=\"font-weight: 400;\">Supreme Power Equipment Ltd<\/span><\/a><span style=\"font-weight: 400;\">., <\/span><a href=\"https:\/\/www.torusdigital.com\/stocks\/shivalic-power-control-ltd-share-price\"><span style=\"font-weight: 400;\">Shivalic Power Control Ltd<\/span><\/a><span style=\"font-weight: 400;\">., and <\/span><a href=\"https:\/\/www.torusdigital.com\/stocks\/rmc-switchgears-ltd-share-price\"><span style=\"font-weight: 400;\">RMC Switchgears Ltd<\/span><\/a><span style=\"font-weight: 400;\">. A comparison with these companies can provide investors with a better understanding of Parth Electricals&#8217; market position and valuation.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Conclusion\"><\/span><b>Conclusion<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Parth Electricals IPO offers an investment opportunity in a company with a diversified product and service portfolio in the <\/span><a href=\"https:\/\/www.torusdigital.com\/stocks\/sectors\/capital-goods-electrical-equipment\"><span style=\"font-weight: 400;\">electrical and engineering sector<\/span><\/a><span style=\"font-weight: 400;\">. With a solid track record of revenue and profit growth, the company appears well-positioned to capitalise on the increasing demand for electrical infrastructure in India. The IPO proceeds are primarily earmarked for working capital, which can support further operational expansion. As with any investment, prospective investors should conduct their own research and consult a financial expert to make an informed decision.<\/span><\/p>\n<p>If you are exploring more investment opportunities, check out our dedicated page on <a href=\"https:\/\/www.torusdigital.com\/ipo\/upcoming-ipo\">upcoming IPO<\/a> listings to stay updated on the latest market offerings.<\/p>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_row_inner el_id=&#8221;share_rating&#8221;][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h6>Rate this article<\/h6>\n<!-- FeedbackWP Plugin --><div  class=\"rmp-widgets-container rmp-wp-plugin rmp-main-container js-rmp-widgets-container js-rmp-widgets-container--12378 \"  data-post-id=\"12378\">    <!-- Rating widget -->  <div class=\"rmp-rating-widget js-rmp-rating-widget\">            <div class=\"rmp-rating-widget__icons\">      <ul class=\"rmp-rating-widget__icons-list js-rmp-rating-icons-list\">                  <li class=\"rmp-rating-widget__icons-list__icon js-rmp-rating-item\" data-descriptive-rating=\"Terrible!\" data-value=\"1\">              <i class=\"js-rmp-rating-icon rmp-icon rmp-icon--ratings rmp-icon--star \"><\/i>          <\/li>                  <li class=\"rmp-rating-widget__icons-list__icon js-rmp-rating-item\" data-descriptive-rating=\"Bad!\" data-value=\"2\">              <i class=\"js-rmp-rating-icon rmp-icon rmp-icon--ratings rmp-icon--star \"><\/i>          <\/li>                  <li class=\"rmp-rating-widget__icons-list__icon js-rmp-rating-item\" data-descriptive-rating=\"Okay!\" data-value=\"3\">              <i class=\"js-rmp-rating-icon rmp-icon rmp-icon--ratings rmp-icon--star \"><\/i>          <\/li>                  <li class=\"rmp-rating-widget__icons-list__icon js-rmp-rating-item\" data-descriptive-rating=\"Good!\" data-value=\"4\">              <i class=\"js-rmp-rating-icon rmp-icon rmp-icon--ratings rmp-icon--star \"><\/i>          <\/li>                  <li class=\"rmp-rating-widget__icons-list__icon js-rmp-rating-item\" data-descriptive-rating=\"Great!\" data-value=\"5\">              <i class=\"js-rmp-rating-icon rmp-icon rmp-icon--ratings rmp-icon--star \"><\/i>          <\/li>              <\/ul>    <\/div>    <p class=\"rmp-rating-widget__hover-text js-rmp-hover-text\"><\/p>    <button class=\"rmp-rating-widget__submit-btn rmp-btn js-submit-rating-btn\">      Submit Rating    <\/button>    <p class=\"rmp-rating-widget__results js-rmp-results rmp-rating-widget__results--hidden\">       <span class=\"rmp-rating-widget__results__rating js-rmp-avg-rating\">0<\/span> \/ 5.  <span class=\"rmp-rating-widget__results__votes js-rmp-vote-count\">0<\/span>    <\/p>    <p class=\"rmp-rating-widget__not-rated js-rmp-not-rated \">          <\/p>    <p class=\"rmp-rating-widget__msg js-rmp-msg\"><\/p>  <\/div>  <!--Structured data -->        <\/div>\n<div id=\"emoji-overlay\" style=\"display: none;\">\n<div id=\"overlay-emoji\"><\/div>\n<div id=\"overlay-description\" class=\"emoji-text\"><\/div>\n<\/div>\n<div id=\"rating-popup\">\n<p><span id=\"popup-close\">\u00d7<\/span><\/p>\n<div class=\"popup_message\">\n<div id=\"popup-emoji\"><\/div>\n<div class=\"popup_innermsg\">\n<h5>Thank You for Rating Our Article!<\/h5>\n<p>Your feedback is incredibly valuable to us, and we&#8217;re thrilled to hear your thoughts.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text css=&#8221;&#8221;]<\/p>\n<h6>Share this article<\/h6>\n<div class=\"cscra-social square cscra-socials-679c8a1122c00\">\n        <a href=\"\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.torusdigital.com%2Ftoruscope%2Fnews%2Fparth-electricals-ipo-opens%2F&t=Parth+Electricals+IPO+Opens%3A+Key+Details+Investors+Shouldn%E2%80%99t+Miss\" class=\"facebook\" data-toggle=\"tooltip\" data-placement=\"top\" title=\"Share On Facebook\" target=\"_blank\"><i class=\"fa fa-facebook\"><\/i><\/a>\n        <a href=\"\/\/twitter.com\/intent\/tweet?text=Parth+Electricals+IPO+Opens%3A+Key+Details+Investors+Shouldn%E2%80%99t+Miss&url=https%3A%2F%2Fwww.torusdigital.com%2Ftoruscope%2Fnews%2Fparth-electricals-ipo-opens%2F\" class=\"twitter\" data-toggle=\"tooltip\" data-placement=\"top\" title=\"Share On Twitter\" target=\"_blank\"><i class=\"fa-brands fa-x-twitter\"><\/i><\/a>\n        <a href=\"https:\/\/api.whatsapp.com\/send?text=Parth+Electricals+IPO+Opens%3A+Key+Details+Investors+Shouldn%E2%80%99t+Miss - https%3A%2F%2Fwww.torusdigital.com%2Ftoruscope%2Fnews%2Fparth-electricals-ipo-opens%2F\" class=\"whatsapp\" data-toggle=\"tooltip\" data-placement=\"top\" title=\"Share On WhatsApp\" target=\"_blank\"><i class=\"fa fa-whatsapp\"><\/i><\/a>\n        <a href=\"\/\/www.linkedin.com\/shareArticle?mini=true&url=https%3A%2F%2Fwww.torusdigital.com%2Ftoruscope%2Fnews%2Fparth-electricals-ipo-opens%2F&title=Parth+Electricals+IPO+Opens%3A+Key+Details+Investors+Shouldn%E2%80%99t+Miss\" class=\"linkedin\" data-toggle=\"tooltip\" data-placement=\"top\" title=\"Share On Linkedin\" target=\"_blank\"><i class=\"fa fa-linkedin\"><\/i><\/a>\n    <\/div>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][\/vc_section]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"[vc_section el_id=&#8221;blog-inner-layout&#8221;][vc_row overlay_dotted=&#8221;&#8221;][vc_column el_class=&#8221;blog_primary&#8221;][vc_row_inner][vc_column_inner][vc_column_text css=&#8221;&#8221;]The Indian IPO market remains a key area of interest for investors, with Parth Electricals &amp; Engineering Ltd. emerging as a new participant, ready to make its debut. The company is launching a book-building IPO to raise \u20b949.72 crores, with the subscription window running from August 4 to August 6, 2025.","protected":false},"author":1,"featured_media":12380,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":"","footnotes":""},"categories":[5,169],"tags":[],"class_list":["post-12378","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.5 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Parth Electricals IPO Opens: Key Details &amp; Analysis for Investors<\/title>\n<meta name=\"description\" content=\"Parth Electricals IPO is a fresh issue of \u20b949.72 crores, opening on August 4, 2025. Get a complete overview of the company, its financials, and the electrical equipment sector.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Parth Electricals IPO Opens: Key Details &amp; Analysis for Investors\" \/>\n<meta property=\"og:description\" content=\"Parth Electricals IPO is a fresh issue of \u20b949.72 crores, opening on August 4, 2025. Get a complete overview of the company, its financials, and the electrical equipment sector.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/\" \/>\n<meta property=\"og:site_name\" content=\"Blog\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-01T10:55:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-24T05:51:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/08\/Parth-Electricals-Engineering-Ltd-IPO.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1441\" \/>\n\t<meta property=\"og:image:height\" content=\"466\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"torus\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"torus\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Parth Electricals IPO Opens: Key Details & Analysis for Investors","description":"Parth Electricals IPO is a fresh issue of \u20b949.72 crores, opening on August 4, 2025. Get a complete overview of the company, its financials, and the electrical equipment sector.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/","og_locale":"en_US","og_type":"article","og_title":"Parth Electricals IPO Opens: Key Details & Analysis for Investors","og_description":"Parth Electricals IPO is a fresh issue of \u20b949.72 crores, opening on August 4, 2025. Get a complete overview of the company, its financials, and the electrical equipment sector.","og_url":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/","og_site_name":"Blog","article_published_time":"2025-08-01T10:55:28+00:00","article_modified_time":"2025-11-24T05:51:00+00:00","og_image":[{"width":1441,"height":466,"url":"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/08\/Parth-Electricals-Engineering-Ltd-IPO.webp","type":"image\/webp"}],"author":"torus","twitter_card":"summary_large_image","twitter_misc":{"Written by":"torus","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/","url":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/","name":"Parth Electricals IPO Opens: Key Details & Analysis for Investors","isPartOf":{"@id":"https:\/\/www.torusdigital.com\/toruscope\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/#primaryimage"},"image":{"@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/#primaryimage"},"thumbnailUrl":"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/08\/Parth-Electricals-Engineering-Ltd-IPO.webp","datePublished":"2025-08-01T10:55:28+00:00","dateModified":"2025-11-24T05:51:00+00:00","author":{"@id":"https:\/\/www.torusdigital.com\/toruscope\/#\/schema\/person\/468d817c6d51cdd85d58071858a47ce5"},"description":"Parth Electricals IPO is a fresh issue of \u20b949.72 crores, opening on August 4, 2025. Get a complete overview of the company, its financials, and the electrical equipment sector.","breadcrumb":{"@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/#primaryimage","url":"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/08\/Parth-Electricals-Engineering-Ltd-IPO.webp","contentUrl":"https:\/\/www.torusdigital.com\/toruscope\/wp-content\/uploads\/2025\/08\/Parth-Electricals-Engineering-Ltd-IPO.webp","width":1441,"height":466},{"@type":"BreadcrumbList","@id":"https:\/\/www.torusdigital.com\/toruscope\/news\/parth-electricals-ipo-opens\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Toruscope","item":"https:\/\/www.torusdigital.com\/toruscope\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/www.torusdigital.com\/toruscope\/.\/news\/"},{"@type":"ListItem","position":3,"name":"Parth Electricals IPO Opens: Key Details Investors Shouldn\u2019t Miss"}]},{"@type":"WebSite","@id":"https:\/\/www.torusdigital.com\/toruscope\/#website","url":"https:\/\/www.torusdigital.com\/toruscope\/","name":"Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.torusdigital.com\/toruscope\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.torusdigital.com\/toruscope\/#\/schema\/person\/468d817c6d51cdd85d58071858a47ce5","name":"torus","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.torusdigital.com\/toruscope\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/09645f2c6ef6bbb3a78db22600040d547bed4438a393e0671d168d69d193bc19?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/09645f2c6ef6bbb3a78db22600040d547bed4438a393e0671d168d69d193bc19?s=96&d=mm&r=g","caption":"torus"},"sameAs":["https:\/\/stage.torusdigital.com\/blogs"],"url":"https:\/\/www.torusdigital.com\/toruscope\/author\/torus\/"}]}},"_links":{"self":[{"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/posts\/12378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/comments?post=12378"}],"version-history":[{"count":4,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/posts\/12378\/revisions"}],"predecessor-version":[{"id":15516,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/posts\/12378\/revisions\/15516"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/media\/12380"}],"wp:attachment":[{"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/media?parent=12378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/categories?post=12378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.torusdigital.com\/toruscope\/wp-json\/wp\/v2\/tags?post=12378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}